Case Studies
The engineering behind the outcome.
Three projects, unpacked in detail.
Coastal Wind Load
Villa Alba
Challenge
A cliffside site with sustained coastal winds ruled out standard sliding-glass specifications.
Solution
ARCHON specified a reinforced sliding window system with a triple-track configuration.
Result
Zero water ingress or hardware failure reported across two full winter storm seasons.


Thermal Performance at Scale
Meridian Headquarters
Challenge
A six-storey curtain wall with four distinct orientations risked uneven solar gain.
Solution
ARCHON modelled solar gain per façade and specified orientation-specific glazing.
Result
Measured cooling load came in under the design target.
Finish Durability in Coastal Air
Obsidian Villa
Challenge
Dark anodised cladding near a marine environment carries a real risk of premature corrosion.
Solution
ARCHON specified a marine-grade aluminium alloy with a reinforced anodised finish.
Result
Three years post-installation, the cladding shows no visible corrosion or finish fading.

Want results like these on your project?
Every case study starts the same way — with a technical audit of what your site actually requires.
Request a Technical Audit